Bridge Access at CN Rail Second Narrows Swing Bridge – Vancouver, BC Canada
Customer:
Contractor: Hymach Industries
Facility Owner: Canadian National Railway
Spider provided access for Hymach Industries to service the roller guide wheels for the lift mechanism on the four columns of the bridge towers. The Second Narrows bridge North Vancouver to Vancouver over the Burrard Inlet, 150 ft feet below. Because this is an active railway bridge that raises every hour to allow boats to pass underneath, the platform needed to move with the swing bridge and be independent of the main structure. This frequent activity also required workers to secure the swingstage and all equipment to the moving bridge section, with just ten minutes notice. Confined rigging space posed challenges as well, including limited access, small openings and ladder openings. A 6 ft knock-down modular platform powered by electric traction hoists provided a lightweight, easily transportable access solution that could pass down through the small access points. Spider engineered a specialized beam clamp assembly attached to the bridge’s moving walkway system to allow the swingstage to travel with the swing deck itself on its regular 30 minute raise and lower cycle. This custom system required no backspan, tieback or projection into the active rail lines across the bridge, enabling complete project access with no rail traffic interruption along this busy corridor.
see next Case Study